Quantcast
Channel: wsdot – Seattle Bike Blog
Browsing latest articles
Browse All 98 View Live

Watch: We know this street design is deadly, so why do we keep building them...

Seattle’s recent Vision Zero review noted that 80% of people killed while walking on Seattle streets are killed on streets with multiple lanes in the same direction. So why are we on the verge of...

View Article



Image may be NSFW.
Clik here to view.

After 6 years of red tape, SDOT is linking the Rainier Valley Greenway to the...

Click for video of the in-progress trail work from SDOT Director Greg Spotts. The Rainier Valley Neighborhood Greenway opened in 2017 with a key piece missing: A connection the final block or so to...

View Article

Image may be NSFW.
Clik here to view.

Alert now-Spring 2024: I-90 Trail detour in Factoria

The alert from WSDOT. Well, I hope you enjoyed that new section of the I-90 Trail in Factoria, because a section of it will be detoured to the other side of SE 36th Street until Spring 2024. As part...

View Article

Watch: Best Side Cycling rides the new Rainier Valley Greenway connection to...

The short but important trail connection between the Rainier Valley Neighborhood Greenway and the I-90 Trail is open, and Hanoch at Best Side Cycling took it for a test ride. As we noted in July, this...

View Article

Image may be NSFW.
Clik here to view.

Alert 12/1-3: 520 Bridge Trail is closed this weekend

The 520 Bridge is completely closed this weekend, and this time the closure includes the trail. Crews will close the bridge starting at 11 p.m. tonight (Dec. 1) and will reopen it 5 a.m. Monday (Dec....

View Article


Image may be NSFW.
Clik here to view.

Alert 12/8–11: 520 Bridge Trail closed again + Montlake Blvd. detour –...

Map of closures from WSDOT. UPDATE: WSDOT announced this morning that the trail work has been cancelled. So the bridge trail will be open this weekend, though sections may be skinnier than usual. The...

View Article

Image may be NSFW.
Clik here to view.

Alert 1/19-2/2: 520 Bridge Trail will be closed for two weeks

Closure map from WSDOT. The trail across the 520 Bridge will be fully closed for two weeks starting January 19 as crews work move the walking and biking route in Montlake into its permanent alignment...

View Article

Image may be NSFW.
Clik here to view.

Crews reopen the 520 Bridge Trail

After being closed for two weeks for construction, the 520 Bridge Trail reopened on schedule Friday. The trail still has some temporary pavement and fencing, and there is still work to do before the...

View Article


Image may be NSFW.
Clik here to view.

The 20-year bike plan for S/SE Seattle: Beacon Hill and Rainier Valley

Download larger JPG images of SE Seattle from the 2014 Bike Master Plan and proposed 2024 Seattle Transportation Plan. Mayor Bruce Harrell’s proposed Seattle Transportation Plan (“STP”) is now in the...

View Article


Image may be NSFW.
Clik here to view.

Alert 3/22-25: Weekend closure for trail that has a name almost nobody knows...

Closure map from WSDOT. The trail that goes under SR 520 between Montlake Blvd and Montlake Playfield that you probably didn’t know had a name will be closed this weekend starting 10 p.m. March 22 and...

View Article
Browsing latest articles
Browse All 98 View Live


Latest Images